TX / Allen
What's Being Built in Allen, TX
Track new construction, road work, restaurants, housing, and public projects in Allen, TX. Built Near Me turns city documents and public records into plain-English project pages with locations, status, source links, and what is still unknown.
Project Map
Explore active and upcoming developments in Allen.
All Projects
16 of 16 shown
The Farm mixed-use district continues building out in Allen
📍 Allen mixed-use district area (exact location pending), TX
The Farm broke ground on Phase 1 in 2021 and the first phase is now open. Allen EDC describes the project as centered around West Lake Park with The Hub entertainment district and more than 1.6 million square feet of office planned. Use this as an umbrella entry for the district and add tenant/building-specific rows separately as they surface.
Sloan Corners West phasing adjusted to add more early housing
📍 Allen mixed-use district area (exact location pending), TX
Council approved phasing modifications for Sloan Corners West, allowing more residential units to be built in Phase 1. The recap says the total number of residential units did not change, but some two-story residences were allowed where the prior plan required three-story minimums. Minor parking and lighting modifications were also approved.
Sloan Corners mixed-use development planned at US 75 and SH 121
📍 Allen mixed-use district area (exact location pending), TX
Describe the overall district plan, land-use mix, and long-range phasing rather than only a single component update.
43 Townhomes Concept Plan in Allen
📍 Allen, TX
A Planning & Zoning packet describes a concept plan for 43 front-entry townhome units in clustered buildings.
The Avenue Single-Family Project
📍 Allen, TX
Allen Planning & Zoning materials reference City Council approval of an amendment to Planned Development No. 142 for The Avenue - Single-Family.
Ford Park Master Plan / Improvements in Allen, TX
📍 Ford Park, Allen, TX
The source signals active planning and design development, but the specific improvement scope still needs to be pulled from Engage Allen or other detailed project materials.
Est. completion Jan 2027
City Hall Front Steps and Main Entry Project
📍 Allen City Hall, Allen, TX
Allen is rebuilding the City Hall front steps and main entrance as an active civic-facility construction project. The work includes entry-area improvements tied to access and long-term building usability.
Oak Hill and Jupiter Road Neighborhood Infrastructure Upgrades
📍 Oak Hill and Jupiter Road neighborhood area, Allen, TX
Allen is advancing neighborhood utility renewal focused on water and wastewater line replacement in the Oak Hill and Jupiter Road area.
US 75 Beautification Project
📍 US 75 corridor, Allen, TX
Allen has approved design-phase work for US 75 beautification improvements along a highly visible regional corridor.
Est. start Jan 2026
New Allen Police Headquarters
📍 Century Parkway between Allen City Hall and the Allen post office, Allen, TX
Allen Police Department is constructing a new headquarters, with city updates indicating visible build-out progress and ongoing major construction activity.
New Chelsea Commons townhomes in Allen
📍 users looking for new townhomes, Allen, TX
Builder page describes new townhomes in Allen within a mixed-use setting.
121 Technology Park industrial development in Allen
📍 Allen mixed-use district area (exact location pending), TX
Allen EDC lists 121 Technology Park as a 58-acre Class A flexible, light industrial and manufacturing development. The development includes seven buildings totaling 740,000 square feet along SH 121. Use as a district-level industrial entry unless building-level permits are added later.
Allen City Center Mixed-Use Apartments
📍 Allen mixed-use district area (exact location pending), TX
Treat this row as a child/component update under a parent district page unless a distinct standalone name/address/phase/source/status is confirmed.
Downtown Allen Catalyst Phase 1 in Allen, TX
📍 Downtown Allen Catalyst, TX
Project details include agreements advancing a $17 million downtown catalyst effort. The city says construction is anticipated by the end of 2026, with the district expected to open in 2028. Use as a high-confidence downtown redevelopment entry, not a private parcel-specific construction permit.
New Homes Near Allen Heights Drive and Bethany Drive
📍 NW corner of Allen Heights Drive and Bethany Drive, TX
Allen approved rezoning for just over 2 acres near Allen Heights Drive and Bethany Drive for single-family homes.
Downtown revitalization at the former Central Fire Station site in Allen
📍 McDermott Drive between South Anna Drive and North Allen Drive, TX
Describe the overall district plan, land-use mix, and long-range phasing rather than only a single component update.